Mooiev
PricingResourcesBlogGet started

MOOIEV BLOG

A video-editor handoff checklist you can actually test

Prepare a small-production edit with an original media manifest, a clear review brief and a recipient-side opening test before calling the handoff complete.

In this article 10 sections

Make the first edit possible without a rescue call

A delivery link is a location, not a complete handoff. An editor still needs to know which material is current, which decisions are approved, what remains unresolved and who can answer the next question. A neatly named folder can be missing all four.

This checklist ends with a test: the receiving editor opens the package in the agreed editing application, identifies the current brief, locates representative picture and sound, and reports the exceptions. This is an original suggested workflow for small productions, not a promise that one folder structure fits every post-production team.

Agree on the assignment before collecting files

Write a short edit brief before uploading media. Separate the first review from final delivery: a review export with temporary music is not a finished master, and a proxy-only editing package does not establish that the finishing team has the originals.

The following example is fictional. Night Bus is a small, staged transport film with invented files and roles. Its specifications are illustrative choices, not recommended defaults for every platform or client.

DecisionFictional handoff agreementWho confirms it
DeliverablesOne 30-second landscape film and one 15-second vertical cut; separate sequences and framing review.Producer and editor
Working setupRecord the exact application/version used, sequence frame rate and resolution in README; agree changes before upgrading.Sending and receiving editor
First reviewA clearly marked review export; unresolved material stays labelled temporary.Editor
ApprovalOne producer returns consolidated notes; the editor flags conflicting instructions before revising.Producer
FinishingIdentify who holds camera originals and who approves the final picture, sound and delivery exports.Producer and finishing editor

Keep camera originals, proxies and references distinguishable

Adobe describes proxies as smaller-resolution copies used for editing. Its proxy attachment workflow links proxy files with full-resolution clips using matching information such as filenames and timecode. That supports a practical distinction in your manifest: identify what a file is, rather than relying on a folder called FINAL.

Preserve the recorded filename and camera-card context in the log. A human-friendly shot label such as 03B / take 2 belongs beside that identity. Two cards can contain similarly named files; the card or source-folder reference helps the receiving editor distinguish them. Check the pairing on a representative clip instead of assuming that similar names prove it.

Do not rename or reorganize an already linked media package casually. Agree the transfer approach with the editor and verify the copied project. If only proxies are being delivered now, say so explicitly and document the location and availability of the originals for the later stage.

Adobe: what proxies are and how they are created

Adobe: attach proxies to full-resolution media

Worked example: a manifest that exposes the missing insert

Use one row per relevant asset or asset set, with the actual inventory becoming as detailed as the job requires. The abbreviated fictional manifest below is a planning example, not a list of real downloadable media. Its last column tells the editor what can proceed and what needs a decision.

The missing ticket insert is a production fact within this invented example, not something the editor should silently invent to satisfy the shot plan. The first review can proceed if the producer agrees to the visible placeholder; final delivery waits for an explicit decision. A planned shot and a recorded clip are different records.

Asset / referenceIdentity and purposeStatus / next action
03B / take 2Card A001: A001C014.mov; proxy A001C014_Proxy.mov. Candidate doorway reaction.Picture pair checked on receipt; selection remains an editorial decision.
03B / soundRecorder card R002: R002_018.WAV. Separate production sound associated in the log.Receiving editor verifies sync against the picture; do not assume the naming proves sync.
03C / ticket insertListed in the shot plan; no corresponding recorded file in this package.Not supplied. Producer confirms whether to omit, replace or arrange a pickup.
Review brief v03NightBus_EditBrief_v03.pdf; one current reference, with the previous version in the archive.Producer confirms this is the version to follow.
Music candidateTEMP_music_01.wav with source and clearance status recorded separately.Reference only; do not treat it as cleared for final delivery.

Give each folder a job and each document a version

An example top-level package is NightBus_Handoff_v01. Use the editor’s agreed organization if one already exists. The names below are suggestions; keeping the contents and README consistent matters more than adopting these exact words.

  • 00_README: current assignment, package version, application/version, contact role, file map and known exceptions.
  • 01_PROJECT: the intended editing project or agreed interchange files, labelled with their version and purpose.
  • 02_MEDIA: camera originals when included; preserve the agreed card and source-folder structure.
  • 03_PROXIES: clearly identified editing proxies, with their relationship to the originals recorded.
  • 04_AUDIO: production sound and other audio, with references back to the media log.
  • 05_BRIEF_AND_REFERENCES: approved brief, script or AV script, selected boards and any relevant shot notes.
  • 06_REVIEW: review exports named by version; clearly distinguish review files from approved masters.
  • 07_STATUS: asset manifest, questions, decisions and the receiving editor’s opening-test result.

Choose the collection method with the editor

For a Premiere project, Adobe documents File > Project Manager and the Collect Files and Copy to New Location option. It gathers footage used in the selected sequences and creates a project linked to the selected media. Review the collection choices deliberately: excluding unused clips can remove alternatives that the receiving editor still needs.

That command is one collection method, not your acceptance test. State which sequences and media were included, then open the copy from its delivered location. If the assignment includes new editing from unselected takes, the package must cover that assignment rather than only the media used in an existing cut.

Adobe: copy projects and review collection options

Ask the recipient to perform the opening test

Run this on the receiving setup and from the delivered package or agreed shared location. A project that opens on the sender’s machine can still depend on files that the receiver cannot access. An upload-complete indicator alone does not answer that question.

  • Open README and identify the approved brief, deliverables and first-review scope without asking the sender.
  • Open the intended project or import the agreed material; record missing media, unsupported dependencies and application/version warnings.
  • Locate a representative picture clip and its sound. Check the intended proxy/original relationship where that workflow is used.
  • Check a sample across the beginning, middle and end for picture/sound alignment; record any discrepancy rather than silently correcting the log.
  • Locate references and temporary assets. Confirm the editor can distinguish them from approved deliverables.
  • Return one acceptance note: package version received, what opened, what is missing and who owns each next action.

Record what the acceptance actually covers

For the fictional Night Bus package, a useful result is: “v01 opens; 03B picture and sound checked; 03C not supplied; temporary music remains reference-only. Ready for first review with the agreed placeholder; not ready for final delivery.” That is more useful than a blanket “all good” because it defines the limit of the acceptance.

Keep the handoff log separate from the revision log

The handoff log answers whether the editor has the material and context to begin. A revision log answers what must change in an existing cut. Keep them linked by package and review versions, but do not bury a missing source clip among creative preferences such as making the opening feel faster.

Keep the relevant script, shot references and planning decisions accessible alongside this record. Editing media, transferring files and producing the final master belong in the tools and storage workflow agreed with the post-production team; this article does not claim that Mooiev is a footage editor or a media-transfer service.

Keep planning notes connected to the production context

Prepare picture and sound references with an AV script

Editorial notes and sources

Written by Mooiev with AI assistance and reviewed for this publication on 23 October 2026. The Night Bus scenario, asset names, folder map, manifest and acceptance note are original fictional examples. They do not describe a customer project or guarantee an editing outcome.

Adobe documentation was checked on the same date for the limited proxy and project-collection descriptions linked above. The remaining checklist is Mooiev’s suggested workflow. No third-party images, real client files, private crew information or licensed music are reproduced.